Skip to main content
Client Success Stories

Making a Difference

Energy Savings Overview: Air Classifier Project – North American Mineral Processing Plant

  • Objective
    Reduce energy consumption by upgrading the classifier system with a VK Engineering modification.
  • Baseline Energy Usage
    944,000 kWh/year at 118.5 kW running power.
  • Post-Upgrade Energy Usage
    704,000 kWh/year at 88.7 kW running power.
Key Results
  • Energy Savings
    240,000 kWh/year (~25% reduction).
  • System Improvements
    Reduced power for the classifier and system fan, with production throughput increased from 3.49 to 3.98 tons/hour.

This project successfully enhanced energy efficiency while supporting higher production capacity, achieving both cost and operational benefits.

Telephone:
+441482526941

Digitalisation of work processes

One of our clients in the manufacturing industry used our services to digitize their maintenance and inspection workflows.

Within six months after implementation, they saw:

  • reduced process times by 30%
  • cut reporting errors by 25%
  • saved $250,000 annually in operational costs
  • Real-time task updates also improved cross-departmental communication, boosting overall efficiency.

Include metrics like energy saved, cost reductions, or efficiency improvements.

client-sucess-stories-3-kireth-ai
client-sucess-stories-4-kireth-ai
client-sucess-stories-5-kireth-ai
client-sucess-stories-6-kireth-ai
client-sucess-stories-7-kireth-ai
client-sucess-stories-8-kireth-ai
client-sucess-stories-9-kireth-ai
    VK Engineering Services Ltd
    5 Brayford Square, London, E1 OSG